Alvarado Water Treatment Plant, San Diego, CA, USA
Print
DYK completing the vertical pre-stressing and the exterior finish of the new Earl Thomas Reservoir. The location called for good seismic stability and several features have been incorporated into the design to mitigate the potential effects of tremors.