DYK completing the vertical pre-stressing and the exterior finish of the new Earl Thomas Reservoir. The location called for good seismic stability and several features have been incorporated into the design to mitigate the potential effects of tremors.
-
San Diego's oldest existing water treatment plant, Alvarado, has received a... -
Phase II ended with the formal ribbon cutting to unveil the new basins. San... -
Aerial view of Lake Murray; completed as part of Phase II, the new... -
DYK completing the vertical pre-stressing and the exterior finish of the new... -
Aerial view of the site during Phase 1A of the work. The programme of... -
The new Earl Thomas reservoir was dedicated in December 2005. The San Diego... -
Aerial view during Phase 1 construction; the Lake Murray raw water pump...