Tunnel excavation at the Bondi STP. The main scope of the construction involves excavating a cavern to provide additional space, work within the plant itself and the refurbishment of the digesters in the above ground section of the facility.
-
Tunnel excavation at the Bondi STP. The main scope of the construction... -
The above ground section of the plant, showing the digesters. The Bondi... -
The abseiling team inspecting one of the digesters. Each of the plant's four... -
The fence being installed on Hugh Bamford Reserve – around half of the... -
The installed fence around the staging area was painted and landscaped with... -
Installing the renovated penstocks; these gates are thought to have been made... -
In January 2006, the demountable buildings were removed from Blair Street... -
One of the ocean outfall pump valves. Removing, refurbishing and reinstalling...