Toshka Project - Mubarak Pumping Station / Sheikh Zayed Canal, Egypt
The pump house has 24 load-controlled, adjustable speed, vertical pumps arranged in two parallel lines. 18 of these run continuously with three offline at any one time for rolling maintenance and a further three held in reserve.