Fully operational since Spring 2008, the project is a central feature in the water infrastructure of the Nile Valley.
-
The Naga Hammadi barrage was completed by the spring of 2008. -
Water levels have been raised by 4m with the completion of the new Naga... -
The new Naga Hammadi barrage is located some 3,500m downstream of the... -
The new barrage is a 320m-long concrete structure erected in a single... -
Fully operational since Spring 2008, the project is a central feature in the... -
The construction of the hydro power station is a significant contribution to... -
The hydropower plant, equipped with four Kaplan turbines, has an installed...