The residuals management building from the air.
-
Construction of the new 1.8 billion litres per day plant was completed in 2008. -
Geothermal piping being laid at the clearwells during the summer of 2005.... -
The Capilano pumping station. Raw water from the Capilano reservoir will be... -
Aerial view of the filtration plant; it occupies a site of around 8 hectares,... -
Artists rendition of the filtration plant. -
Artists rendition of the filtration plant elevation in situ. The design has... -
Aerial view of the thickener tanks under construction in the spring of 2007. -
UV units in the filter pipe gallery. The plant has the largest ultraviolet... -
The filtration pipe gallery. The project was largely driven by the need to... -