Home > Industry Projects > Water Transmission > Shuweihat
|
A section of the twin transmission line during construction. It runs 250km from the Shuweihat desalination plant to Musaffah in Abu Dhabi and has been laid above the natural ground-level for most of the route |
|
|
|