Shuweihat

Specifications - Shuweihat Water Transmission Scheme, United Arab Emirates


Key Data
Desalination plant 
TypeMulti-stage flash
Capacity378,000m³ / day
Water production63,000m³ (gross) / day per unit
Water storage6 x 77,000m³ tanks
Pipeline 
Distance spanned250km
Weight410,000 tonnes
Total length500km
TypeTwin DN 1600
MaterialDuctile iron
Earthwork bunds15 million m³
Pumping station 
Number Two (Marfa; Musaffah)
TypeFreshwater
Pump drivesWater-cooled, variable speed
Automated management systemSCADA
Data management transmissionFibre optic cables
Switchgear33kV, 11kV, low-voltage
Final design capacity600,000m³ / day
Project cost 
Pipeline$300m
Desalination plant$508m
Integrated electrical system$27m
Project Timeline
Design and construction supervision contract awarded2000
Engineering / procurement / construction contract signedNovember 2001
Pipeline contract awardedJuly 2002
First gas turbine synchronisedJune 2003
Distillate produced from the first desalination unitSeptember 2003
Final desalination unit commissionedOctober 2004
Project completedOctober 2004
Key Players
ClientAbu Dhabi Water and Electricity Authority
Main contractorsMarubeni Corporation and Taisei Corporation
Design engineersCansult Maunsell
Construction engineersDoosan Heavy Industries and Construction
Project managerCansult Maunsell
Integrated electrical system supplierABB
Desalination plant supplierFisia Italimpianti Spa
Pump supplierTorishima
Steady state verification and surge analysesWL / Delft Hydraulics
Dual-pressure heat-recovery steam generatorsNooter Eriksen / Gruppo Marcegaglia
Combined-cycle power plant supplierSiemens AG
Featured Suppliers
WL | Delft Hydraulics - Pipeline Hydraulics Design Software


client logon
Home
Products & Services
Company A-Z
White Papers
Jobs & Careers
Press Releases
Advertise With Us
Events & Exhibitions
Newsletter
New On This Site
About Us
Atom FeedRSS Feed
What is RSS?