The site in September 2003. The design and build phase accounts for 30 months of the 30-year concession.
-
Some of the plant's membrane elements in situ; Sulaibiya is the largest... -
Construction of the plant began in July 2002 and was completed by November... -
Diagram of the general layout of the Sulaibiya plant. -
The reverse osmosis facility - 42 skids, each comprising 72 pressure vessels... -
Schematic flow diagram of the major treatment steps at the new plant. -
The plant has a total ultrafiltration (UF) membrane area of 304,640m²... -
Part of the new feed pipeline awaiting installation. The project called for... -
The site in September 2003. The design and build phase accounts for 30 months... -
Images from the project; the Sulaibiya plant is the largest of its kind in... -
Although the product water is destined for non-potable uses, it is treated to...