X

Brightwater WWTP Project, US

Main picture, a typical section through the new outfall; a tug pulls outfall sections into place (top left); a section of the diffuser (top right); near-shore trench sheeting (bottom left); graphic of barge-mounted cranes lowering outfall segment (bottom right).



Close
Close
Close