| Sirco Industrial | ||
CLRS-50 closed-loop IX treatment system - 50g/m. |
FlowMatix DSLM dissolved solids loading meter. |
MRS 40 and MRS 10 electrolytic recovery system. |
EVAP 30 atmospheric evaporator – 30g/hr. |
Ozone groundwater treatment - 45g/hr (20-well injection system). |
|
| WABAG | ||
The Beni Messous biological wastewater treatment plant went into operation within the framework of a DBO concept. |
The reverse osmosis plant at Bandar Imam is the core element in a versatile water treatment plant with a capacity of 163,000ªm/d for the production of five water qualities for an industrial complex. |
The Adana West WWTP (250,000ªm/d) employs an activated sludge process with biogas utilisation for the generation of thermal and electrical energy in a DBO-project with four years of operational management by WABAG. |
The unique direct-potable water reuse plant Windhoek Goreangab, Namibia, 21,000 m3/d utilises an advanced multi-barrier-system. |
Sludge treatment installation for one of Beijing‘s largest wastewater plants with a capacity of 600,000 m3/d. |
|